Modular Locker Room

PROJECT PROFILE


Project Partners: Fabcon Precast

Building Use: 24’ X 60’ Locker Room and Rest Room

Time: 6 weeks

Download Case Study

Mobile Modular Provides a Locker Room Building in Expedite Manner

Background

Fabcon bought an old pre-cast concrete plant that was in need of immediate repairs. In order to expedite the opening of the factory floor to take orders, they needed a locker room building.


The Solution

Lockers for their employees. Because of the modular process, our team was able to expedite the lead time to 6 weeks in order to make sure they could open the factory floor in a timely manner.

Why Call Mobile Modular

By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.

If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.

Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!

Modular Locker Room

Customer

Customer Name: FABCON PRECAST

Project Location

Project Location: Selkirk, NY

Building Type

Building Type(s): Modular Locker Room

Total Area

Total Sq. Ft: 1,440 sq. ft.

New or Used

New or Used Building: New

Job Type

Job Type: Sale