Old Redford Academy - Modular Middle School
PROJECT PROFILE
Project Partners: Old Redford Academy
Building Use: Modular Two-Story Classrooms
Total Sq. Ft: 20,765 square feet
Download Case StudyMobile Modular Builds and Connects a 2-Story Modular Addition to an Existing Building in 7 Days.
Background
Old Redford Academy purchased an existing church adjacent to their elementary for their expanding middle school population. They renovated the existing church building to accommodate an auditorium, cafeteria, gym, and office space. After the renovation, they were still in need of additional middle school classroom space. Our Team constructed a 2-story modular addition that connected to the existing building through an enclosed corridor. The new addition features 14 classrooms, 2 science rooms, and 2 restrooms. The building’s exterior finishes were chosen to blend seamlessly with the existing renovated 100-year-old church. The building was installed and secured in 7 days.
Why Call Mobile Modular
By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.
If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.
Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!