Helping Maintain Productivity at the Ritz Carlton Hotel
PROJECT PROFILE
Project Partners: PCL Construction
Building Use: Modular Office
Total Sq. Ft: 12,144 sq. ft.
Download Case StudyMobile Modular Provides Offices for Construction Crew at the Ritz Carlton
PCL Construction was renovating and adding an addition to the Ritz Carlton hotel in Naples, FL. PCL was looking for a modular building provider that could build offices for their on-site contractors.
The Solution
Mobile Modular was able to provide PCL Construction with an efficient turnaround time with new modulars for the fiveplex. Our team worked cohesively with our local engineer and setup crew to create a plan to offer a higher dry-stack install, which the county required due to the site being in a flood zone. Each pier also required to be surface bonded to ensure durability and strength in the area that could potentially be flooded.
What Was Provided
Mobile Modular provided (1) 60 x 60 and (1) 12×56 for PCL and (1) 12 x 56 for their electrical sub (Tri-City); delivering where and when the customer had wanted and expected and completed this project on time and on budget.
Why Call Mobile Modular
By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.
If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.
Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!