Modular Housing During COVID-19
PROJECT PROFILE
Project Partners: University of Richmond
Building Use: Modular Housing
Time: 60 days
Download Case StudyMobile Modular Provided a University with Modular Housing During COVID-19
Background
In an effort to safely return students to campus during the COVID-19 pandemic, the University of Richmond sought out Mobile Modular to provide a quick and efficient building solution to meet the student’s health and academic needs.
The Challenge
The challenge presented to Mobile Modular was to build, deliver, and install 150 beds before the students returned to campus. With only 60 days to pull this off, Mobile Modular utilized our team of experts to deliver a safe and effective solution for the University.
The Solution
Rooms included single occupancy with individual bathrooms, showers, microwaves, mini-fridges, TVs, and high-speed internet to provide the same benefits the students would get in the other housing provided on campus.
Why Call Mobile Modular
By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.
If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.
Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!
WINNER OF THE MODULAR BUILDING INSTITUTE AWARD OF DISTINCTION