working on it... Image not found

Building Up Instead of Out to Meet Growing Classroom Needs

PROJECT PROFILE


Customer: St. Johns County School District – Tocoi Creek High School

Location: St. Augustine, Florida

Industry: Education

Project Type: Two-Story Modular Classroom Complex

Supporting Student Growth with Flexible Modular Classrooms

St. Johns County School District serves one of Florida’s rapidly growing communities, creating an ongoing need for additional educational space. At Tocoi Creek High School, increasing enrollment required the district to add classroom capacity while preserving limited campus space and minimizing disruption to students and staff.

Mobile Modular provided an innovative two-story modular solution that allowed the school to expand vertically rather than outward.

The Challenge

Rapid enrollment growth created an immediate need for additional classroom space at Tocoi Creek High School. However, available campus space was limited, and a traditional single-story portable classroom solution would have required a larger footprint and reduced valuable outdoor and circulation areas.

The district needed a solution that could:

  • Add meaningful classroom capacity within a constrained campus footprint.
  • Preserve outdoor space and existing campus circulation.
  • Be delivered faster than conventional construction.
  • Minimize disruption to an active school campus
  • Provide safe, ADA-compliant access to all classrooms.
  • Meet Florida’s demanding wind and weather requirements.
  • Give the district flexibility as future enrollment needs change.

The challenge was not simply finding more space—it was finding a smarter way to use the space already available.

The Solution

Mobile Modular partnered with St. Johns County School District to develop a two-story classroom complex using the Eco II Xpand™ modular building platform.

By building vertically, Mobile Modular increased instructional space within a compact footprint while helping preserve valuable campus property.

The complete solution incorporated:

  • Six classrooms within a two-story modular complex.
  • Elevated walkways and stair systems.
  • An ADA-compliant vertical platform lift.
  • Covered canopy systems.
  • Pre-engineered access and foundation solutions.
  • Coordinated site and circulation planning.

The building and supporting access systems were planned as one integrated solution, helping the new classrooms function as a natural extension of the existing campus.

The modular approach also allowed much of the building construction to occur away from the school site, helping reduce on-site disruption and accelerate installation.

The Results

The completed Tocoi Creek High School expansion demonstrates how vertical modular construction can help school districts address growing enrollment without sacrificing valuable campus space.

Maximized Campus Space

The two-story configuration concentrated six classrooms within a smaller footprint than a comparable single-story solution, helping preserve outdoor areas and existing campus circulation.

Faster Classroom Expansion

Factory-built modular construction and streamlined site installation helped the district respond to classroom needs more quickly than traditional site-built construction.

Accessible by Design

An integrated ADA lift, elevated walkways and stair systems provide convenient access to both levels while reducing the need for extensive ramp systems.

Built for Florida Conditions

The facility incorporates durable materials, high-performance insulation and structural engineering designed for Florida’s demanding environmental and wind conditions.

Quality Learning Environments

Bright, comfortable classrooms feature modern HVAC systems, programmable controls and quality interior finishes designed to support students and teachers.

A Flexible Approach to School Growth

For Tocoi Creek High School, expanding upward provided an innovative way to address immediate classroom needs while protecting the campus space required for students, activities and future growth.

The project demonstrates how modular construction can provide school districts with a faster, flexible and space-efficient approach to facility expansion—without compromising accessibility, functionality or the learning environment.

Maximizing Campus Space with Two-Story Modular Construction

Customer

Customer Name: St. Johns County School District – Tocoi Creek High School

Project Location

Project Location: St. Augustine, Florida

Building Use

Building Type: Eco II Xpand™ Two-Story Modular Classroom Complex

Building

Temporary or Permanent: Temporary Educational Facility

Square Footage

Module Configuration: Six Classrooms, 144' x 36' Two-Story Configuration

Building Up Instead of Out to Meet Growing Classroom Needs 1
Building Up Instead of Out to Meet Growing Classroom Needs 2
Building Up Instead of Out to Meet Growing Classroom Needs 3
Building Up Instead of Out to Meet Growing Classroom Needs 4
Building Up Instead of Out to Meet Growing Classroom Needs 5
Building Up Instead of Out to Meet Growing Classroom Needs 6

*Click on the image to see the full-size view!

Contact Us Today To Learn How Our Modular Building Solutions Can Work For You

Back to top
GET A QUOTE REQUEST SERVICE