Xpand Modular Office and Clean Power for Early Construction Mobilization

PROJECT PROFILE


Project Location: Western U.S.

Industry Type: Industrial Infrastructure

Building Type: Xpand + SVEGO

Project Type(s): Xpand two story, EV Charging

Permanent or Temporary: Temporary

Clean Power and Flexible Workspace for Early-Stage Construction Mobilization

Customer profile

The customer is a construction/infrastructure organization that was preparing to begin work on a new project site. As with many early-stage developments, the project team needed to establish an on-site presence quickly, including office space for project management, operations, field coordination, and daily construction administration.

The customer also had internal sustainability goals and wanted to avoid relying solely on diesel generator power during the early phases of construction. In addition to powering the field office, the customer anticipated the need to support electric vehicles or electric equipment as part of the project’s clean power strategy.

Challenge

The project was ready to move forward, but permanent grid power was not expected to be available for several months. This created a familiar issue for new construction sites: the work needed to begin before the utility infrastructure was complete.

The customer needed a solution that could provide:

  • A professional construction and operations office.
  • Power for HVAC, lighting, computers, communications, and daily office activity.
  • A smaller site footprint as available space was limited.
  • Flexibility as the project team grows or site needs change.
  • EV charging capability for vehicles and equipment.
  • A cleaner alternative to traditional generator-only temporary power.

The office solution also needed to be practical for a construction environment. Xpand was well suited to this type of application because the product is designed as a flexible, stackable modular building system that can help customers maximize limited site footprints while supporting growth and changing needs.

The Solution

Mobile Modular provided an integrated temporary site solution using its Xpand modular office paired with a SVEGO clean power and EV charging system.

The Xpand office gave the project team a functional, professional workspace that could be deployed in a compact footprint. Because Xpand units can be combined side-by-side, end-to-end, or stacked up to three stories high, the layout could be adapted to the customer’s operational needs without requiring excess land area.

The SVEGO system supported the power side of the project. By pairing renewable energy generation, battery storage, and EV charging capability with the Xpand office, the customer was able to begin site operations before permanent utility service was available.

Together, the solution addressed both sides of the problem:

  • Xpand provided the workspace.
  • SVEGO provided clean temporary power.
  • The combined system supported early mobilization.
  • The customer reduced dependence on diesel generator power.
  • EV charging capability was available before grid power arrived.

Objectives

The customer’s primary objective was to establish a working project office before permanent power was available.

Additional objectives included:

  • Reduce delays caused by utility power availability.
  • Provide a comfortable and professional office environment.
  • Use a modular building solution that could fit within a limited site footprint.
  • Support clean power and sustainability goals.
  • Provide charging capability for electric vehicles or equipment.
  • Maintain flexibility as the construction project evolved.

Xpand supported the space-related objectives through its flexible configurations, custom layout options, and ability to stack vertically to minimize footprint. Other Xpand benefits are space saving, scalable, time saving, cost efficient, and energy efficient.

Outcome

The combined Xpand and SVEGO solution allowed the customer to establish a functional operations office during the earliest phase of the project, even though permanent grid power was not yet available.

The Xpand modular office created usable workspace for project personnel while reducing the amount of site area required for the office installation. The SVEGO unit supplied clean temporary power and EV charging capability, helping the customer align site mobilization with its clean power initiative.

Instead of waiting for utility power or relying entirely on a traditional diesel generator approach, the customer had a cleaner, quieter, and more flexible path to getting the project team operational.

The result was a temporary jobsite solution that helped the customer:

  • Delivered and installed 85 modular building floors in approximately two months
  • Supported construction on a $3 billion AI data center campus
  • Installed buildings before permanent utilities were available.
  • Operated successfully in sub-zero North Dakota winter conditions.
  • Coordinated transportation, utility solutions, and installation across multiple partners.
  • Enabled uninterrupted project operations through reliable temporary office space.

Quotes - “Getting started before permanent power is available is one of the biggest challenges on a new project site. When Mobile Modular offered the solution of their Xpand office space with SVEGO clean power, we were able to create a functional operations hub that supported both our construction schedule and our sustainability goals.”

Xpand Workspace and Clean Power Support Early Construction Mobilization

Customer

Customer Name: Construction & Infrastructure Customer

Project Location

Project Location: Western U.S.

Building Use

Building Type: Xpand modular office with SVEGO clean energy and EV charging system

Building

Temporary or Permanent: Temporary

Square Footage

Module Configuration: Two-story Xpand modular office configuration

Xpand Modular Office and Clean Power for Early Construction Mobilization 1
Xpand Modular Office and Clean Power for Early Construction Mobilization 2
Xpand Modular Office and Clean Power for Early Construction Mobilization 3
Xpand Modular Office and Clean Power for Early Construction Mobilization 4
Xpand Modular Office and Clean Power for Early Construction Mobilization 5
Xpand Modular Office and Clean Power for Early Construction Mobilization 6
Xpand Modular Office and Clean Power for Early Construction Mobilization 7
Xpand Modular Office and Clean Power for Early Construction Mobilization 8
Xpand Modular Office and Clean Power for Early Construction Mobilization 9
Xpand Modular Office and Clean Power for Early Construction Mobilization 10

*Click on the image to see the full-size view!