Hybrid Modular Classroom Construction

PROJECT PROFILE


Project Partners: Thea Bowman Leadership Academy

Building Use: Modular Classrooms

Total Sq. Ft: 80,000 square feet

Download Case Study

Mobile Modular Combined Modular and Traditional Construction to Add Modular Classrooms

Background

Leaders of the Thea Bowman Leadership Academy identified the need to extend their elementary and middle school program to include a high school. The achievements of the K–8 program and the waiting list for the 9–12 grades would ensure a full enrollment if the facility could be provided. The new facility would house both the middle school and high school, giving much-needed room for expansion at the elementary school. No existing local facilities were available to accommodate the needs of the Academy. Therefore, a search was conducted to locate an appropriate building site, which was identified with less than one year to complete the construction process. The programming design included a facility that would house both middle and high school students while maintaining controlled interactions between the two groups.

Mobile Modular’s Expertise

Our team worked with the architect, school board, and the school’s authorizer, the Drexel Foundation for Educational Excellence to design and then construct the two-story modular classroom building, site-built gymnasium, and site-built administrative wing. The design utilized individual wings for the middle and high schools, which were connected and separated by a central core of common shared services such as the media center, science laboratories, art rooms, and cafeteria.

Why Combine Traditional and Modular?

The combination of modular and traditional construction techniques allowed for a “Phased Opening” of the facility, which allowed the academy to occupy the modular classrooms and support areas of the building for the opening day of school, followed by the finishing of the site-built gymnasium and administrative wing. This “Hybrid” construction method improved the project schedule and met the academy’s budget while maintaining an excellent educational environment. Today, the school is home to the proud students of the Thea Bowman Leadership Academy Eagles.

Why Call Mobile Modular

By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.

If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.

Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!

THE BOWMAN JR. HIGH/HIGH SCHOOL CAMPUS

Customer

Customer Name: Thea Bowman Leadership Academy

Project Location

Project Location: Gary, IN

Building Size

Building Size(s): Modular Classroom

Total Area

Total Sq. Ft: 80,000 sq. ft.

New or Used

New or Used Building: New

Job Type

Job Type: Sale


      Hybrid Modular Classroom Construction
     1

      Hybrid Modular Classroom Construction
     2

      Hybrid Modular Classroom Construction
     3

      Hybrid Modular Classroom Construction
     4

      Hybrid Modular Classroom Construction
     5

      Hybrid Modular Classroom Construction
     6

      Hybrid Modular Classroom Construction
     7

      Hybrid Modular Classroom Construction
     8

      Hybrid Modular Classroom Construction
     9

      Hybrid Modular Classroom Construction
     10

      Hybrid Modular Classroom Construction
     11

*Click on the image to see the full-size view!

Back to top