State Mobile Teaching Lab

PROJECT PROFILE


Project Partners: Tennessee Board of Regents

Building Use: Mobile Training Center

Time: 195 days

Download Case Study

Mobile Modular was Awarded a State Contract to Complete a Project in All Phases

Background

Mobile Modular was awarded a contract with the Tennessee Board of Regents (TBR) to design, engineer, and solicit manufacturing proposals, and production and site installation of a steel-framed modular structure to be used as a mobile training center located at one of Tennessee’s State Universities.


Design Phase

In the design phase, Mobile Modular worked with TBR to move from concept design to construction documents. During this phase of work, we locked in the final floor plan layouts, required equipment specifications, materials specifications, MEP requirements, constructibility requirements, and relevant information to send to the factories for pricing out the construction phase work.

Bid Phase

Upon completion of the design and engineering documents, Mobile Modular created bid packages to send to the prequalified manufacturers for completion of the modular units in the factory, delivery to the job site, and scope of installation requirements for the completion of the project.

Construction Phase

The project included the fabrication of multiple transportable modular units which were connected on-site with minimal site adaptation work. The units are capable of supporting classroom space, welding lab space, and self-contained utilities including restroom facilities and electrical services for training equipment. The units are capable of using both on-site electrical services as well as generator-supplied services. They also feature self-contained waste and water systems. Units included entrances with canopies, ramps, and steps which were transported with the units.

The Final Product

All materials used in both the structure and finishes consisted of durable hard surface materials capable of industrial use without the need for any external structural support. Once installed, the final modular building is up to all the state of Tennessee building codes and seismic requirements.

Why Call Mobile Modular

By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.

If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.

Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!

TENNESSEE BOARD OF REGENTS

Customer

Customer Name: Tennessee Board of Regents

Project Location

Project Location: Dayton, TN

Number

Module Count: 5

Total Area

Total Sq. Ft: 3,254 sq. ft.

New or Used

New or Used Building: New

Calendar

Days to Complete: 195

State Mobile Teaching Lab 1
State Mobile Teaching Lab 2
State Mobile Teaching Lab 3
State Mobile Teaching Lab 4
State Mobile Teaching Lab 5
State Mobile Teaching Lab 6
State Mobile Teaching Lab 7
State Mobile Teaching Lab 8
State Mobile Teaching Lab 9
State Mobile Teaching Lab 10
State Mobile Teaching Lab 11
State Mobile Teaching Lab 12
State Mobile Teaching Lab 13

*Click on the image to see the full-size view!

Back to top