Caribbean Refinery Project

PROJECT PROFILE


Project Partners: Limetree Bay Refining

Building Use: Modular Dorms / Rec / Admin Kitchen / Dining

Total Sq. Ft: 489 Modular Building totaling over 400,000 square feet

Time: A little over 6 months

Download Case Study

Mobile Modular Relocated 489 Modular Buildings from Saskatchewan to the Caribbean

Background

The Limetree Bay Terminals facility consists of approximately 32 million barrels of crude oil and petroleum product storage, idled refinery units with a total peak processing capacity of 650,000 barrels per day, and a deep-water port with 10 petroleum docks.


The Project

Mobile Modular purchased, disassembled, relocated, and reassembled a massive 489-module accommodation facility from the frozen ground of Saskatchewan to the Caribbean island of St Croix – all at a blistering pace.

The Process

The first 1,020 beds were ready within 6 months (with 450 additional beds delivered and installed in the following months). The project entailed the coordination of hundreds of contractors, trucking, rail, and ocean freight over 5,000 miles – all on time and on budget.

Why Call Mobile Modular

By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.

If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.

Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!

LIMETREE BAY VILLAGE

Customer

Customer Name: Limetree Bay Refining

Project Location

Project Location: St. Croix, USVI Building

Building Type

Building Type(s): Modular Dorms / Rec / Admin Kitchen / Dining

Number

Module Count: 489

Total Area

Total Sq. Ft: ~400,000 sq. ft.

New or Used

New or Used Building: Used

Job Type

Job Type: Sale


      Caribbean Refinery Project
     1

      Caribbean Refinery Project
     2

      Caribbean Refinery Project
     3

      Caribbean Refinery Project
     4

      Caribbean Refinery Project
     5

      Caribbean Refinery Project
     6

      Caribbean Refinery Project
     7

      Caribbean Refinery Project
     8

      Caribbean Refinery Project
     9

      Caribbean Refinery Project
     10

      Caribbean Refinery Project
     11

      Caribbean Refinery Project
     12

*Click on the image to see the full-size view!

Back to top